A bill of quantities, also called a BOQ, is a document that lists the items of work in a building project with the quantity of each item. Builders and contractors use it to price a job in the same way, so tenders can be compared fairly. This guide explains what a BOQ is, what it includes and how it differs from a takeoff or an estimate.
What does BOQ stand for?
BOQ stands for bill of quantities. In some Australian projects it is also called a schedule of quantities.
What is a bill of quantities?
A bill of quantities is a list of materials, labour and work items, each with a description, a unit and a quantity. It is prepared from the plans and specifications. Everyone who tenders for the job prices the same list, so there is less room for missed items and misunderstandings.
What does a BOQ include?
- A short description of each item of work
- The unit of measure, for example m2, m3, lineal metres or number
- The quantity of each item taken from the plans
- Rates and totals, once a contractor has priced the list
- Provisional sums and prime cost items, where the final cost is not yet known
Example of a BOQ (for illustration only)
| Item | Description | Unit | Quantity |
|---|---|---|---|
| 1 | Excavate for footings | m3 | 24 |
| 2 | Concrete slab, 100 mm | m2 | 150 |
| 3 | Face brickwork | m2 | 210 |
| 4 | Colorbond roof sheeting | m2 | 180 |
These numbers are an example only and do not come from a real project.
BOQ vs quantity takeoff vs estimate
- Quantity takeoff: measuring the quantities from the plans.
- Bill of quantities: the organised list of those quantities that contractors price.
- Estimate: the priced cost of the project, with rates and totals.
A takeoff comes first. The BOQ is built from the takeoff, and the estimate adds the prices. See our quantity take-off services.
Who prepares a BOQ?
A BOQ is usually prepared by an estimator or quantity surveyor. Builders and developers also outsource it when they do not have time to measure the plans themselves.
Why a BOQ helps with tenders
- Every tenderer prices the same quantities, so quotes are easy to compare.
- Missed items are found before the job starts.
- Variations are easier to price because the original quantities are on record.
Need a bill of quantities prepared?
Nextron Estimating Pty Ltd prepares BOQs from your plans for builders, contractors and developers across Australia. Send us your plans and scope, and we will quote the work. See our tender estimating services and commercial estimating services.
Frequently asked questions
What is a BOQ in construction?
It is a list of the items of work in a project and their quantities, used to price and compare tenders.
What is the difference between a BOQ and an estimate?
A BOQ lists the items and quantities. An estimate puts a price on them.
Can you prepare a BOQ from PDF plans?
Yes. Send PDF or CAD plans and we will do the takeoff and prepare the BOQ.