Demolition estimating, Australia

Demolition Estimating Services in Australia

Nextron Estimating Pty Ltd measures what has to be removed from your plans and prices the work, including waste, bins and labour. You get a clear takeoff and estimate for quotes, tenders and budgets.

measured from plans waste and bins

At a Glance

Service
Demolition takeoff and priced estimate
Who it is for
Demolition contractors, builders and developers
You send
Plans, plus photos and a scope note describing what is to be removed
You receive
A takeoff and priced estimate you can check and adjust
Timeframe
Most residential estimates take 1 to 3 business days. Larger projects take longer, and we confirm the timeframe in your quote
Office
26 Bendemeer Way, Palmview QLD 4553. We work with clients across Australia

What Is Demolition Estimating?

Demolition estimating means working out what has to be removed, how much waste it makes and what the work costs. We measure the plans, list each item, and price labour, plant, waste and tipping.

Photos help us see access and condition. Plans are still the best starting point, because they show what is to be removed and what stays.

What Our Demolition Estimates Include

Strip-out and removal

Internal strip-out and removal of linings and fixtures.

Structural and partial demolition

Walls, roofs and structure removed, as shown on the plans.

Slabs and concrete

Removal of slabs, footings and concrete.

Waste, bins and tipping

Waste volumes, bin hire and tipping allowances.

Site protection and making good

Site protection, temporary works and making good.

Plant and labour

Allowances for plant and labour.

How a Demolition Takeoff Is Measured

Each item is listed with a unit of measure, so you can check it against the plans. This is the format we use for the main items.

ItemUnitHow it is measured
Internal strip-outm2 or allowanceWall and ceiling areas to be removed, from the plans
Wall demolitionm2 or lineal metresMeasured from the floor plans and elevations
Roof removalm2Area measured from the roof plan
Slabs and footingsm3 or m2Area and thickness from the plans and sections
Wastem3 or binsCalculated from the quantities removed
Site protectionAllowanceStated in the estimate and agreed with you
Plant and labourHours or daysAllowance, based on the scope
Making goodm2 or allowanceMeasured where new work meets the old

Demolition Projects We Estimate

House demolitions

Full demolition of an existing house.

Renovation strip-outs

Removing linings, fixtures and finishes before a renovation.

Renovation estimating

Partial demolition for extensions

Opening up walls and roofs where new work joins the old.

House extension estimating

Commercial fit-out strip-outs

Strip-out of shops, offices and tenancies.

Fit-out estimating

Slab and concrete removal

Breaking out and removing slabs and footings.

Concrete estimating

Site clearing before earthworks

Removal work ahead of excavation.

Earthworks estimating

Why Use an Outsourced Demolition Estimator

More tender capacity

Price more jobs without hiring a full-time estimator.

Fewer missed items

Waste, bins, plant and making good are listed, so they are not missed.

Quote with confidence

A clear estimate helps you quote or set a budget before work starts.

Related Estimating Services

Renovation estimating

Renovations priced from your plans.

Renovation estimating

House extension estimating

Extensions priced from your plans.

House extension estimating

Earthworks estimating

Excavation, cut and fill, priced from your plans.

Earthworks estimating

Quantity takeoff

Measured quantities for the whole building, item by item.

Quantity takeoff

How It Works

1

Send your plans

Email the plans, photos and a note of what is to be removed.

2

We confirm the scope

We confirm what is included and send a quote and timeframe.

3

We take off and price

We measure the plans and prepare the priced estimate.

4

You review and adjust

You review it and we make agreed adjustments.

Important Note

We do not assess or remove hazardous materials. Where a licensed assessor has identified materials such as asbestos, we can include an allowance for the removal cost shown in their report. Removal must be done by licensed contractors.

Frequently Asked Questions

What does a demolition estimator do?

A demolition estimator measures what has to be removed, works out the waste and labour, and prices the job.

Do you include asbestos removal?

Only as an allowance, based on a licensed assessor’s report. We do not assess or remove hazardous materials. Removal must be done by licensed contractors.

Can you estimate from photos?

Plans are preferred. Photos help show access and condition.

What do you need to start?

The plans, photos if you have them, and a note of what is to be removed and what stays.

How long does a demolition estimate take?

Most residential estimates take 1 to 3 business days. Larger or more complex projects take longer, and we confirm the timeframe in your quote before work starts.

Do you work outside Queensland?

Yes. Our office is in Palmview, Queensland, and we work with clients across Australia by email and phone.

Get a free quote

Send your plans for a free quote. Email info@nextronestimating.com.au or call +61 468 251 702, or use the estimate request form.

Request an estimate